HOME  »  The Brand New House » 0507-Construction  (36 Slides)     [Page 1 of 1]  
  Up one level  

Construction

It took 8 months to build our house from ground up. We are very much involved in the building process from the beginning: We selected our lot, customized the floor plan / windows / deck, and selected all the interior / exterior decorative materials. Wilshire Home did a great job building the house. It is amazing to see our modern new house coming out of a bunch of trees. :)

0507-Construction - 01 * The street before our house is built. The bunch of trees is our home site * 1600 x 1200 * (433KB)
0507-Construction - 02 * A close look at out home site * 1600 x 1200 * (456KB)
0507-Construction - 03 * The foundation * 3008 x 2000 * (1.53MB)
0507-Construction - 04 * The frame is up :) * 3008 x 2000 * (1.56MB)
  The street before our house is built. The bunch of trees is our home site  
  A close look at out home site  
  The foundation  
  The frame is up :)  
0507-Construction - 05 * The roof frame * 3008 x 2000 * (1.48MB)
0507-Construction - 06 * The stairs * 3008 x 2000 * (1.52MB)
0507-Construction - 07 * The front proch to-be * 3008 x 2000 * (2.05MB)
0507-Construction - 08 * The frame for the two-story family room * 2000 x 3008 * (1.86MB)
  The roof frame  
  The stairs  
  The front proch to-be  
  The frame for the two-story family room  
0507-Construction - 09 * Window frame of the small bedroom * 3008 x 2000 * (1.42MB)
0507-Construction - 10 * The blue house -- the blue foam is the insulation material * 3008 x 2000 * (2.13MB)
0507-Construction - 11 * Worker at the construction site * 2000 x 3008 * (1.95MB)
0507-Construction - 12 * The familiy room is getting into shape * 2000 x 3008 * (1.75MB)
  Window frame of the small bedroom  
  The "blue house" -- the blue foam is the insulation material  
  Worker at the construction site  
  The familiy room is getting into shape  
0507-Construction - 13 * The dinning area beside the kitchen * 3008 x 2000 * (1.99MB)
0507-Construction - 14 * High ceiling in the loft area on the upper floor * 2000 x 3008 * (1.76MB)
0507-Construction - 15 * Double door in the master bedroom * 3008 x 2000 * (1.7MB)
0507-Construction - 16 * The back side of the house * 3008 x 2000 * (1.22MB)
  The dinning area beside the kitchen  
  High ceiling in the loft area on the upper floor  
  Double door in the master bedroom  
  The back side of the house  
0507-Construction - 17 * The A/C lines in the attic * 1600 x 1200 * (434KB)
0507-Construction - 18 * Running the A/C lines into the house * 1200 x 1600 * (717KB)
0507-Construction - 19 * Fireplace and the familiy room * 1600 x 1200 * (416KB)
0507-Construction - 20 * The bricks are here! * 1600 x 1200 * (434KB)
  The A/C lines in the attic  
  Running the A/C lines into the house  
  Fireplace and the familiy room  
  The bricks are here!  
0507-Construction - 21 * Electric wires * 2000 x 3008 * (1.53MB)
0507-Construction - 22 * Bath tub in the master bathroom * 3008 x 2000 * (1.54MB)
0507-Construction - 23 * The bricks * 1600 x 1200 * (431KB)
0507-Construction - 24 * The workers are installing the bricks * 1600 x 1200 * (401KB)
  Electric wires  
  Bath tub in the master bathroom  
  The bricks  
  The workers are installing the bricks  
0507-Construction - 25 * The workers * 1600 x 1200 * (422KB)
0507-Construction - 26 * The bricks are almost done :) * 1438 x 958 * (581KB)
0507-Construction - 27 * The insulation in the attic * 1161 x 1571 * (691KB)
0507-Construction - 28 * The wall in the master bedroom * 1600 x 1200 * (431KB)
  The workers  
  The bricks are almost done :)  
  The insulation in the attic  
  The wall in the master bedroom  
0507-Construction - 29 * The family room * 1566 x 1156 * (767KB)
0507-Construction - 30 * Building the drive way * 1600 x 1200 * (433KB)
0507-Construction - 31 * The kitchen cabinet * 3008 x 2000 * (1.61MB)
0507-Construction - 32 * French door to Ju's study * 2000 x 3008 * (1.61MB)
  The family room  
  Building the drive way  
  The kitchen cabinet  
  French door to Ju's study  
0507-Construction - 33 * The almost finished family room * 3008 x 2000 * (1.58MB)
0507-Construction - 34 * The drive way is built * 1669 x 1907 * (1.2MB)
0507-Construction - 35 * The finished house with the front lawn and two pear trees * 3008 x 2000 * (1.54MB)
0507-Construction - 36 * The street with our house -- compare this with the first photo in the album! * 3008 x 2000 * (1.77MB)
  The almost finished family room  
  The drive way is built  
  The finished house with the front lawn and two pear trees  
  The street with our house -- compare this with the first photo in the album!  
Album last updated on 9/6/05 11:31 PM
Powered by JAlbum 5.2 and BluPlusPlus skin
Ju Long and Michael Yuan, 2005